Snagging
Snagging is the process of inspecting completed construction work to identify defects and unfinished items that need to be put right before handover.
Snagging is the inspection process, usually carried out towards the end of a construction project, to identify defects, faults, and unfinished work that need correcting before the building is handed over. Items found, known as snags, might include poor finishes, damaged fittings, missing components, or work not built to specification.
Snags are typically recorded on a snagging list, often with photos and locations, and passed to the responsible contractor to put right. A follow-up inspection then confirms the items have been completed. Snagging is a matter of contract and quality management rather than health and safety law, though it may overlap with safety where a defect creates a hazard.
A clear, photographed snagging record helps avoid disputes at handover and gives the client confidence that outstanding items have been resolved.